When Should You Secure BNG Units in the Planning Process?
Contact us to find out how we can help
Timing is one of the most critical, and often underestimated, factors in successfully delivering biodiversity net gain (BNG). While many developers are now aware of the requirement to achieve a minimum 10% uplift in biodiversity, fewer fully understand when they need to act to secure off-site units.
In practice, BNG is not a standalone requirement that can be addressed at the end of the process. It is embedded within the wider planning process and must be considered from the earliest stages of site assessment and scheme design. Failure to do so can result in delays to a planning application, increased costs, and in some cases, a risk to the overall viability of the development.
CW Habitats provides a detailed, practical overview of when BNG units should be secured, how timing interacts with planning risk, and what a robust strategy looks like in the current regulatory environment.
Why Timing Matters for BNG
Under the Environment Act 2021, most developments in England must demonstrate that they will deliver measurable biodiversity improvements. These improvements must be secured as part of the planning permission and maintained over a minimum period of 30 years.
This fundamentally changes how biodiversity is treated within development. It is no longer a technical detail to be resolved late in the process; it is a core planning consideration that must be addressed alongside design, viability, and land use.
From a planning perspective, local authorities require confidence that biodiversity gains are:
- Deliverable in practice
- Secured through appropriate legal mechanisms
- Supported by realistic management arrangements
If a developer cannot demonstrate this at the appropriate stage, it introduces uncertainty into the application. This often leads to requests for further information, delays in determination, or, in some cases, refusal.
Timing, therefore, is not simply about convenience; it directly affects planning risk, cost certainty, and programme delivery.
Understanding the Planning Timeline
To determine when BNG units should be secured, it is helpful to understand how biodiversity fits into the broader planning process.
A typical development timeline includes:
- Site identification and acquisition
- Feasibility and early assessment
- Design development and technical studies
- Pre-application engagement
- Submission of the planning application
- Determination by the local authority
- Discharge of conditions and implementation
BNG considerations run through each of these stages. Importantly, the requirement to demonstrate how biodiversity gain will be achieved arises before planning permission is granted, not after.
Stage 1: Early Feasibility – Identifying BNG Risk
The earliest stage at which BNG should be considered is during feasibility and site acquisition.
At this point, developers should undertake an initial ecological appraisal to understand:
- The baseline biodiversity value of the development site
- The presence of priority habitats or ecological constraints
- The likely impact of development on existing habitats
Although detailed metric calculations may not yet be available, it is often possible to identify whether a site is likely to generate a biodiversity shortfall.
This is particularly important when assessing land value and scheme viability. Sites with high existing ecological value may require significant mitigation or off-site compensation, which can affect both cost and deliverability.
Ignoring BNG at this stage can lead to unrealistic assumptions about developable area and profitability.
Stage 2: Design Development – Quantifying the Shortfall
As the scheme progresses into detailed design, biodiversity considerations become more precise.
At this stage, developers will typically:
- Commission ecological surveys
- Apply the statutory biodiversity metric
- Calculate baseline and proposed biodiversity values
- Refine the layout to incorporate on-site mitigation
This process produces a clear understanding of the biodiversity impact of the scheme, including whether the required uplift can be achieved on-site.
For many developments, particularly urban or high-density schemes, it becomes evident at this point that on-site delivery will not be sufficient. The extent of the shortfall can then be quantified in terms of biodiversity units.
This is a critical decision point. Once a shortfall is identified, developers should begin actively exploring off-site solutions.
Stage 3: Pre-Application Engagement – Securing a Strategy
The pre-application stage is where BNG strategy should be formalised.
Local planning authorities increasingly expect developers to engage early on biodiversity matters and demonstrate a clear approach to delivering net gain. This includes:
- Confirming the biodiversity baseline and proposed uplift
- Demonstrating how the biodiversity gain hierarchy has been applied
- Identifying whether off-site units will be required
- Outlining how those units will be secured
At this stage, developers should not only identify potential off-site solutions but also assess their availability and suitability.
Engaging with the market for off-site units during pre-application provides several advantages:
- Greater choice of suitable gain sites
- Improved cost certainty
- Reduced risk of delays later in the process
Waiting until after submission to consider these issues is likely to create unnecessary pressure and uncertainty.
Stage 4: Planning Application – Demonstrating Deliverability
By the time a planning application is submitted, developers must be in a position to demonstrate that their BNG strategy is deliverable.
This does not necessarily mean that all legal agreements must be completed, but it does require:
- A clear calculation of biodiversity impact using the metric
- Identification of any off-site units required
- Evidence that suitable units are available
- A credible route to securing those units
This information is typically set out within a biodiversity gain plan or equivalent supporting documentation.
From a planning authority’s perspective, the key issue is confidence. They must be satisfied that the proposed biodiversity gains are realistic and can be secured within the required timeframe.
Where this is not demonstrated, applications are often delayed while further information is requested.
Stage 5: Post-Permission – Formalising Agreements
Following the grant of planning permission, biodiversity requirements are secured through planning conditions and legal agreements.
This often includes:
- Section 106 agreements
- Conservation covenants
Before development can commence, developers must:
- Finalise the acquisition of off-site units
- Ensure that the land delivering those units is legally secured
- Confirm that management and monitoring arrangements are in place
Although this stage involves formalising agreements, it should not be the point at which developers begin looking for solutions. By this stage, the strategy should already be established.
The Optimal Point to Secure BNG Units
In practical terms, the most effective point to secure BNG units is between the design development stage and the submission of the planning application.
At this point:
- The biodiversity shortfall has been quantified
- The number of units required is known
- The scheme design is sufficiently developed
- There is still flexibility to adapt the approach if needed
Securing units at this stage provides a balance between certainty and flexibility, allowing developers to proceed with confidence.
Risks of Delaying BNG Procurement
Developers who delay securing BNG units often encounter a range of issues that can affect programme and cost.
Planning Delays
Without a clear strategy, applications may be delayed while additional information is provided.
Supply Constraints
As demand increases, suitable off-site units may not be available at short notice, particularly in high-demand areas.
Cost Uncertainty
Late-stage procurement can result in higher prices, particularly where there is limited supply.
Design Disruption
If biodiversity requirements cannot be met, schemes may need to be redesigned, affecting both layout and viability.
These risks reinforce the importance of early engagement and proactive planning.
Market Dynamics and Availability
The market for off-site biodiversity units is still evolving, but demand is increasing rapidly as BNG becomes embedded within the planning system.
This creates a number of important dynamics:
- Availability varies significantly by location
- Certain habitat types are in higher demand
- Prices are influenced by both supply and strategic value
Developers who engage early are better positioned to secure appropriate units and manage cost effectively.
How Can CW Habitats Assist?
CW Habitats supports developers by providing access to off-site biodiversity solutions and helping to manage the timing of BNG procurement.
Our role is focused on connecting developers with suitable gain sites that can deliver the required biodiversity units. This includes:
- Identifying available sites that align with the needs of a specific development
- Providing insight into local supply and demand conditions
- Supporting early-stage engagement to reduce planning risk
- Helping developers secure units at the appropriate stage of the process
We understand that timing is critical. By engaging with CW Habitats early, developers can gain clarity on availability, avoid last-minute procurement challenges, and strengthen their planning submissions.
In addition, we work alongside a network of experienced professionals who can support:
- Biodiversity assessments and metric calculations
- Habitat creation and enhancement
- Legal structuring through Section 106 agreements or conservation covenants
- Long-term management and monitoring
This integrated approach ensures that developers not only secure the units they need, but do so in a way that aligns with planning requirements and long-term delivery obligations.
Registered Office
23 Bark Street East, 1st Floor, Bolton
BL1 2BQ
Phone
01204 939 608
habitats@collingtonwinter.co.uk
Contact us to find out how we can help
Olivia Collington is the Managing Director of Collington Winter Environmental and a Chartered Environmentalist specialising in biodiversity net gain (BNG). She works closely with landowners and developers to deliver off-site BNG solutions, including habitat creation, habitat banking and the sale of biodiversity units. With extensive experience in applying the statutory biodiversity metric and securing compliant biodiversity gain sites, Olivia helps clients navigate the BNG market with confidence, ensuring long-term, policy-aligned outcomes for both development and nature.