The introduction of mandatory biodiversity net gain (BNG) has changed the planning system across England. Since becoming law, most developments in England must now deliver measurable biodiversity improvements as part of securing planning permission.
One of the most common questions from developers and landowners alike is:
“What are off-site biodiversity net gain units?”
This FAQ guide explains how off-site units work, when they are required, how they are secured, and what landowners need to understand before entering into long-term agreements.
What is biodiversity net gain (BNG)?
Biodiversity net gain (BNG) is a legal requirement introduced under the Environment Act. It requires most new developments to deliver at least a 10% increase in biodiversity compared to the site’s baseline condition.
In simple terms, development must leave nature in a better state than it found it.
This uplift is measured using the statutory biodiversity metric, which calculates habitat value before and after development.
What are off-site biodiversity net gain units?
Off-site BNG units are biodiversity units generated on land outside the boundary of a development site. They are used when a developer cannot deliver sufficient biodiversity gains within their own red line boundary.
If biodiversity uplift cannot be fully achieved on the development site itself, the developer must secure additional units elsewhere. These units are known as off-site BNG units.
They are created through habitat creation or habitat enhancement on separate land, often owned by private landowners.
Why are off-site BNG units needed?
Under BNG rules, developers must first follow the biodiversity gain hierarchy:
- Avoid habitat loss where possible
- Minimise damage
- Restore habitats on-site
- Enhance habitats on-site
- Deliver off-site biodiversity gains
Only when on-site delivery is insufficient can off-site units be used.
Many development sites are constrained by:
- Limited land area
- High-density design
- Existing infrastructure
- Viability pressures
In these cases, off-site delivery becomes essential for meeting BNG requirements.
How are off-site biodiversity net gain units created?
Off-site units are generated on what is known as a gain site. A gain site is land used specifically to create or enhance habitats that deliver measurable biodiversity uplift.
The process typically involves:
- A baseline ecological survey
- Calculation of existing habitat value
- Habitat creation or enhancement proposals
- Metric recalculation to determine uplift
- Legal securing of the site
The difference between baseline and post-creation value determines the number of site biodiversity units available for allocation.
What is a habitat bank?
Some gain sites operate as a habitat bank.
A habitat bank is a larger, strategically managed site that generates biodiversity units for sale to multiple developments over time. Rather than being linked to a single planning application, a habitat bank can supply units across several development sites.
Habitat banks offer:
- Scalability
- Structured long-term management
- Greater flexibility for developers
- Clear legal and monitoring frameworks
They are increasingly common in areas with consistent development demand.
How are off-site units linked to a development?
Off-site units must be formally allocated to a specific development site. They cannot simply exist independently.
Before a developer can implement planning permission, they must demonstrate that biodiversity gains are secured. This usually forms part of the planning application process.
The allocation of off-site units is referenced in the biodiversity gain plan submitted to the local planning authority.
Planning permission cannot lawfully proceed until the biodiversity gain plan has been approved.
How are off-site BNG units secured?
All biodiversity gains must be secured for at least 30 years.
This long term requirement ensures environmental improvements are durable and enforceable.
Off-site units are typically secured through a legally binding mechanism, such as:
- A Section 106 agreement under the Town and Country Planning Act
- A conservation covenant
A Section 106 legal agreement is made between the developer (or landowner) and the local planning authority. It places enforceable obligations on the land.
A conservation covenant is an agreement between a landowner and a designated responsible body, which may include conservation organisations approved by government.
Both mechanisms ensure that habitat managing obligations are binding and enforceable.
Who oversees the system?
The national biodiversity gain register is overseen by Natural England.
Once a gain site is legally secured, it must be registered. This creates transparency and prevents units from being double-counted.
Natural England’s role ensures that biodiversity net gain BNG operates within a structured and accountable framework.
How long do off-site agreements last?
All off-site biodiversity gains must be maintained for 30 years.
During this period:
- Habitats must be managed according to agreed prescriptions
- Monitoring reports must be submitted
- Inspections may take place
- Failures to meet targets can trigger enforcement
This long term structure ensures biodiversity gains are real and not temporary.
What responsibilities do land managers have?
Land managers who operate gain sites must commit to:
- Implementing agreed habitat creation works
- Following management plans
- Monitoring habitat condition
- Reporting progress
- Allowing access for inspection
Selling off-site units is not a passive investment. It involves structured ecological management over three decades.
However, these obligations also provide predictable income tied to legally enforceable agreements.
Do off-site units replace on-site mitigation?
No. The biodiversity gain hierarchy requires on-site mitigation to be prioritised. Off-site units are only used when necessary to meet the 10% gain requirement.
This ensures biodiversity gains are embedded into site design wherever possible.
What happens if off-site units are not available?
If a developer cannot secure sufficient off-site units, they may need to purchase statutory biodiversity credits from the government.
However, these credits are designed as a last resort and are intentionally more expensive. As a result, developers prefer to secure units from private gain sites or habitat banks.
Why are off-site units important for developments in England?
Since mandatory BNG came into force, most developments in England must demonstrate measurable biodiversity gains before receiving full planning approval.
Off-site BNG units:
- Enable constrained development sites to proceed
- Support strategic habitat creation
- Deliver landscape-scale environmental improvement
- Encourage private landowners to invest in nature recovery
They are now a central part of the planning system.
What is the red line boundary?
The red line boundary defines the land included within a planning application. On-site biodiversity must be delivered within this boundary. Anything outside it is considered off-site and must be secured through a formal legal agreement. This distinction is critical when calculating site biodiversity units.
Are off-site BNG units a good opportunity for landowners?
For suitable landowners, off-site BNG units can offer:
- Stable income secured for 30 years
- Diversification beyond agriculture
- Contribution to environmental improvement
- Alignment with sustainability goals
However, it is a serious long term commitment that requires careful planning and professional advice.
How CW Habitats can assist
Navigating off-site biodiversity net gain BNG can feel complex. From baseline surveys and metric calculations to legal agreements and long-term habitat managing obligations, there are multiple technical and regulatory steps involved.
CW Habitats supports both land managers and developers throughout the process.
For landowners, we:
- Assess whether land is suitable as a gain site
- Coordinate ecological surveys and statutory biodiversity metric calculations
- Advise on habitat creation proposals and realistic unit yield
- Structure long-term arrangements secured for 30 years
- Assist with Section 106 agreements or conservation covenants
- Register sites with Natural England
- Market available site biodiversity units to developers
For developers, we:
- Identify suitable off-site BNG units
- Ensure units meet local planning authority expectations
- Support biodiversity gain plan preparation
- Coordinate legal agreements required for planning permission
Our focus is on delivering high-quality, compliant biodiversity gains that align with planning policy and provide long-term certainty for all parties.
If you are exploring off-site BNG units, whether buying or selling, seeking early professional advice can significantly reduce risk and improve outcomes.
Registered Office
23 Bark Street East, 1st Floor, Bolton
BL1 2BQ
Phone
01204 939 608
habitats@collingtonwinter.co.uk
Contact us to find out how we can help
Olivia Collington is the Managing Director of Collington Winter Environmental and a Chartered Environmentalist specialising in biodiversity net gain (BNG). She works closely with landowners and developers to deliver off-site BNG solutions, including habitat creation, habitat banking and the sale of biodiversity units. With extensive experience in applying the statutory biodiversity metric and securing compliant biodiversity gain sites, Olivia helps clients navigate the BNG market with confidence, ensuring long-term, policy-aligned outcomes for both development and nature.