BNG Small Sites Rules: What Developers Need to Know

Contact us to find out how we can help

Since the introduction of mandatory biodiversity net gain BNG, many developers have focused on larger schemes. However, there remains significant uncertainty around how BNG applies to smaller developments and whether smaller projects face the same obligations as major schemes.

The reality is that many small developments are subject to BNG requirements, and understanding the rules early can help avoid delays during the planning process. Whether you are building a small housing scheme, converting land for residential development, or promoting a site through the planning system, biodiversity considerations are now an important part of modern development.

CW Habitats explains how BNG applies to small sites, the role of the small sites metric SSM, and what developers need to consider when preparing planning applications.

bng small sites

What is Biodiversity Net Gain?

Biodiversity net gain (BNG) is a mandatory requirement introduced under the Environment Act. It requires most developments in England to leave biodiversity in a measurably better state than before development took place.

In practical terms, developers must demonstrate at least a 10% improvement in biodiversity compared to the site’s baseline condition.

This is achieved by:

  • Assessing existing habitats
  • Calculating biodiversity losses and gains
  • Delivering biodiversity improvements on-site or off-site
  • Securing those improvements for the required period

BNG became mandatory for most developments in April 2024, making biodiversity a key consideration in both site design and planning strategy.

What is Considered a Small Site?

The definition of a small site is important because it determines whether developers can use the simplified small sites metric (SSM). For residential development, a small site is generally one where:

  • The number of dwellings proposed is below certain thresholds, and
  • The site area is less than 0.5 hectares

For commercial developments, different thresholds apply based on floor space measured in square metres. Developers should always confirm eligibility before relying on the simplified metric, as certain site characteristics may require use of the full biodiversity metric instead.

What is the Small Sites Metric SSM?

The small sites metric SSM is a simplified version of the biodiversity assessment process developed to reduce complexity for smaller schemes. It provides a more streamlined approach to calculating biodiversity impacts while still ensuring that developments comply with BNG rules.

The metric was developed with input from Natural England and is designed to make biodiversity assessments more accessible for smaller projects.

Importantly, the small sites metric is not appropriate for every development. Some sites will still require the full version of the statutory biodiversity metric calculation tool.

When Can the Small Sites Metric Be Used?

The simplified metric can only be used where specific criteria are met. For example, the small sites metric is generally not suitable where:

  • A priority habitat is present
  • Protected sites are affected
  • The development involves particularly complex ecological issues

Where these circumstances arise, developers will typically need a more detailed assessment using the full version of the statutory biodiversity metric calculation tool.

This is one reason why early ecological advice remains important, even on relatively small sites.

Why Biodiversity Assessments Matter

One of the most common mistakes made by site developers is assuming that a smaller scheme means biodiversity can be dealt with later. In reality, biodiversity assessments should be considered at an early stage of project planning.

An ecological assessment helps establish:

  • Existing habitat value
  • Potential biodiversity constraints
  • Whether a priority habitat is present
  • The likely biodiversity uplift required

Understanding these factors early can help developers avoid costly redesigns and planning delays.

How BNG Affects the Planning Process

BNG is now embedded within the wider planning process. When preparing planning applications, developers must demonstrate how biodiversity requirements will be met.

This may involve:

Increasingly, local planning authorities expect biodiversity considerations to be addressed at an early stage rather than being left until planning determination. Failure to provide sufficient information can lead to delays and requests for additional ecological information.

Can Small Sites Need Off-Site Biodiversity Units?

Yes. Although smaller developments generally have a lower biodiversity impact than larger schemes, they often face a different challenge: lack of space.

Many small sites have limited opportunities for habitat creation within the site boundary. As a result, some developments cannot achieve the required biodiversity uplift entirely on-site.

Where this happens, developers may need to secure off-site biodiversity units.

The exact requirement will depend on the outcome of the biodiversity assessment and the number of biodiversity unit credits needed to achieve compliance.

The Role of Local Planning Authorities

Local planning authorities play an important role in ensuring compliance with BNG legislation. When reviewing planning applications, they will consider:

  • The biodiversity baseline
  • The assessment methodology used
  • Whether the correct metric has been applied
  • How biodiversity gains will be delivered
  • Whether the proposed solution complies with BNG requirements

These assessments now form part of wider planning decisions, meaning biodiversity can directly affect whether a development progresses.

How Can CW Habitats Assist?

For developers working on small developments, understanding biodiversity obligations can be challenging, particularly where off-site solutions may be required.

CW Habitats helps connect developers with suitable off-site biodiversity opportunities and provides access to trusted professionals who can assist with ecological and legal requirements.

We can help developers:

  • Understand potential biodiversity shortfalls
  • Explore off-site biodiversity solutions
  • Connect with suitable biodiversity gain sites
  • Navigate key aspects of BNG planning

By engaging early, developers can reduce planning risk and ensure biodiversity requirements are considered before they become a problem.

Registered Office

23 Bark Street East, 1st Floor, Bolton

BL1 2BQ

Phone

01204 939 608

Email

habitats@collingtonwinter.co.uk

Contact us to find out how we can help

Olivia Collington

Olivia Collington is the Managing Director of Collington Winter Environmental and a Chartered Environmentalist specialising in biodiversity net gain (BNG). She works closely with landowners and developers to deliver off-site BNG solutions, including habitat creation, habitat banking and the sale of biodiversity units. With extensive experience in applying the statutory biodiversity metric and securing compliant biodiversity gain sites, Olivia helps clients navigate the BNG market with confidence, ensuring long-term, policy-aligned outcomes for both development and nature.